To help pay for improvements the City of Greenfield worked with R/M to apply for and receive over $650,000 in funding for this project so far, which is about 30% of the overall project costs. These grants focused on five critical areas of project design and construction completion of design plans, water quality and stream characterization, permitting, public outreach and community engagement, and construction. Those opportunities included the following.
Ruekert & Mielke, Inc. (R/M) teamed with the Village of Brown Deer to plan and design a restoration and naturalization project for a stretch of Beaver Creek and Brown Deer Trail in the heart of the Village. Village officials recognized the need to revitalize a significant portion of the creek and the heavily-used trail that runs parallel to it. R/M set out to transform the entire appearance of the creek and trail by altering the layout and adding natural features to make a pedestrian-friendly corridor that connects the Village’s outer residential neighborhoods to a growing commercial and retail development corridor.
The City of Greenfield struggled with storm events flooding Wildcat Creek to the point of frequent over-topping, structure flooding, and bank erosion. The community voiced concerns during public information meetings, driving the City to understand the extent of the flooding problems. Ruekert & Mielke, Inc. (R/M) were brought on board to assist with our professional engineering services to determine the flood risks and develop a more integrated storm water system.